Bisinella Developments - The key to your community

Lara Lakes Estate, Lara

NOW SELLING FROM$345,000

Welcome to Lara Lakes Estate, Lara

Lara Lakes Estate is a residential estate in Lara which will offer residents the benefits of a country lifestyle with all of the comforts of city living.

Spacious parklands, scenic waterways and natural play spaces are just some of the highlights of Bisinella’s plans for the 520-lot Lara Lakes Estate.

Modelled on the national-award winning Grand Lakes Estate, the new estate will include 6.7ha of open space, including wetlands, extensive walking trials and two playgrounds, including one in the Linear Reserve. There will also be land set aside for a future primary school and community centre.

Lara Lakes Estate will also feature 75 lake/park frontage lots. Land in the estate will range from 350m2 to 750m2.

The new estate is located in the area known as the Lara West Development Precinct which is situated on the south west side of the corner of Windermere Road and O’Hallorans Road, Lara.

Land in Stage One of Lara Lakes Estate was released in November, 2020. Construction of the first stage of the estate is expected to start at the end of June 2021.

Fully Serviced Lots
  • All services such as sewer, water, power, natural gas and telecommunications.

High Speed Broadband
  • Optic fibre telecommunications provided by Opticomm.

Fencing
  • Pre-coated steel fencing with grey sheeting and posts with an estimated value of $3,500. Fencing includes all side and rear boundary fences, except where the garage is on the boundary.

Developer Solar Panel Rebate
  • $1,000 Solar Panel Rebate for buyers that install solar panels within 3 months of construction completion.

Laybacks and Crossovers
• The layback and crossovers are provided as part of the development. If you require your layback and crossover in a different location, please contact us to discuss if a change is possible.

Protective Covenants

• Lara Lakes Estate has building guidelines to ensure that quality homes and landscaping are implemented, creating a quality estate for the benefit of its future residents.

Lara Lakes Estate Highlights
  • 10 minute drive to Princes Highway for convenient access to Melbourne/Geelong
  • 45 minute drive to Melbourne CBD
  • 10 minute drive to the Lara Train Station
  • 15 minute drive to Geelong CBD  
  • 10 minute drive to You Yangs National Park

Please contact our sales team via email at sales@bisinella.com.au or phone Shane Ruffin on 0413 804 523 if you have any questions or wish to place a lot on hold.


Price List and Availability

Interactive map

Estate Brochure



News

updates

July Construction Update

Published: 21/07/2022

Construction overview Physical construction works
There are a number of steps involved in the physical construction of the site ready for you to build on, these include:

o   Site preparation - where the ground is cleared and the existing levels are cut or filled to the finished lot levels

o   Installation of

read more..

June Construction Update

Published: 21/06/2022

Lara Lakes update

Lara Lakes construction continues to progress well with the following updates.

Title estimates:
   Stage 1 – August 2022
   Stage 2 – August 2022
   Stage 3A – September 2022
   Stage 4A – April 2023
   Stage 4B – April 2023

read more..

Bisinella signs on as major sponsor for Lara Wildcats 2022 season

Published: 03/06/2022

The Lara Wildcats Baseball Club has entered a women’s team in the inaugural Geelong Baseball Association’s Women’s Baseball League. 

The news comes as Bisinella Developments re-signs as a major sponsor of the Wildcats for the season. 

Lara Wildcats Baseball Club President Jarrod Fraim said it was an exciting time for the club

read more..

Bisinella rebate supports landowners with switch to solar

Published: 17/05/2022

Bisinella’s $1000 rebate is supporting landowners make the switch to solar – helping the environment and homeowners to reduce their power bills. 

The solar rebate is available to buyers who purchase a lot in relevant Bisinella estates and install solar panels within three months of construction completion. 

The rebate will apply to

read more..
More